Bridge restoration underway on Bypass
Work on an NCDOT Bridge Preservation Project will continue to require overnight closures along Dr. Calvin Jones Highway/NC 98 Bypass through October. American Contracting & Services, Inc., a private contractor working on behalf of NCDOT, is alternately closing all lanes along eastbound and westbound Dr. Calvin Jones Highway/NC 98 Bypass from Ligon Mill Road to Galaxy Drive weeknights and (some) weekends from 9 p.m.-5 a.m. The lane closures are necessary to allow crews to preserve the bridge over Richland Creek. Detour signage will be in place each evening to manage traffic flow and safely direct traffic around the work area. Delays are expected, so motorists are encouraged to avoid the area if possible and plan an alternate route. The bridge rehabilitation project consists of milling and repaving the bridge approaches, repairing the concrete deck, substructure, railing, and bridge joint, epoxy coating the concrete girder ends, and treating the bridge deck. The